Remaining: In the VAB, the crawler transporter positions by itself underneath Cell Launcher 1 in planning for rollout of SA-501 into the launch pad – Take note the worker inside the foreground for dimensions comparison. On arrival within the Vertical Assembly Developing, Just about every phase was inspected in https://judahtsrro.blogdon.net/detailed-notes-on-apollo-4-plus-50063551