Originally, the Jai Hind metro station was planned to be elevated. Nonetheless, the AAI objected that the elevated stretch up for the airport could pose a threat to plane, Hence the route was additional reworked as well as station was shifted underground, a hundred and fifty m within the Airport terminal https://railwaykolkata24444.daneblogger.com/31505638/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf