Then Tesla would just have GB/T, CCS1, and CCS2 requirements to handle in producing. But as stated, the Products S and X would need layout modifications for An even bigger cost port. As of 2024 the Level two J1772 adapter (with NACS plug) remains utilised at most general public AC https://mariojyjpy.blogerus.com/53876479/the-smart-trick-of-southernmost-point-of-tasmania-that-nobody-is-discussing