(This stage is required when pipe slicing is done from 3mtr pipe to any demanded length all through set up) After reducing, the pipe must be chamfered from the outer sides. It's recommended to offer an about 2mm huge, one hundred fifty chamfer on spigot finish. I would want to https://austropipes.com/swr-pipes-and-fittings-manufacturer/